← All inspectionspassedpassedpassedpassed
Inspection · 000004
Galvanized cable tray · Yiwu
Yunshan Gridcraft · 8 Aug 2026
Verdict: approved for shipment
passedAll recorded checks meet the approved specification. Review the evidence and findings below.
On-site evidence · 2 photos
Geo-tagged · Timestamped in China Standard Time · Captured by the assigned auditor. Click a photo to inspect.
Inspection details
- Auditor
- Kirana Wei
- Assignment method
- Randomly assigned · independent
- Inspection date
- 8 Aug 2026
- Inspection fee
- IDR 1,900,000
Checklist & findings
Packaging integrity
Matches the approved specification.
Quantity and dimensions
Matches the approved specification.
Surface and material quality
Matches the approved specification.
Export documentation
Matches the approved specification.